护士制服丝袜动漫亚洲|av片在线观看|色戒免费观看完整版国语版|一区二区国产精品精华液,怎样看色戒完整版,色戒未册完整版免费下载,梁朝伟色戒高清完整版在线

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Constructors and local Lao residents attend the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos, March 21, 2019. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

   Prev 1 2 3  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501